Project Yoreme
Resources
Development Phase
Humans
- One coordinator general.
- Content Developers:
- Two developers for the Text, Code and Web curriculum.
- One developer for the Graphics curriculum.
- One developer for the Audio curriculum.
- One developer for the Robotics curriculum.
- One web designer.
- One teacher/adviser, expert in the development of formats.
- One developer of Diaspora social networks.
- One adviser/expert in Debian
to create a project-specific distribution of the operating system.
- One network administrator to design the Yoreme Network.
Materials
- The software we'll be working with1.
-
Classmate computers of diferent generations to test the operating system and the various software in specific architectures.2.
- A server to build a pilot Yoreme Network.
Pilot Phase
Humans
- Between 18 and 36 children aged around eleven. These participants must be divided into 2 or 3 groups with 9 to 12 members each. The groups must be distributed in different geographic points.
- From 3 to 6 facilitators. We require two distinct facilitator profiles. The first one is essentially a teacher, and we require one per center. The other one is more focused on technology, and we require at least one technical facilitator for every two centers (If they're close enough that the facilitator may easily travel between both).
- One network administrator to manage the servers.
- One monitor, to supervise this pilot phase, and report back on possible adjustments to be made to the program.
- Four developers of scripts and formats.
- One website administrator.
Contents
- Modules (see Curricula)
- Virtual Materials
Materials
- Per each learner:3
- One
Classmate portable computer.
- One set of full-range headphones.
- One robotics kit. 4
- Per each center:
- One classroom with infrastructure for 12 children with laptops (desks, chairs, electricity and web access).
- One computer for the facilitator.
- One server.
- One projector and screen.
- One sound system which can mix 4 different input signals.
- One printer.
- One scanner.
- Adequate cables for all the above equipment.
Time
- Preparation
- Infrastructure set-up: 3 days.
- Laptop configuration: 1 week for every 20 computers.
- Server configuration and testing: 5 days.
- Training of facilitators: 2 weeks, 6 hours per day.
- Workshops
- Total duration: 15 weeks.
- Frequency: 3 sessions per week.
- Duration of each session: 3 hours.5
- Evaluation
- One day to receive feedback from facilitators.
- Four days to evaluate the results of the workshop.
<- Go back to Curricula or Go on to References ->